
Selected back fill work

Shear wall work

Hard coring

RC column

slab form work and re-bar work
Gypsum finishing work

Slab form work, scAffolding placement

porforated pipe installation

water proof membrane work

Ready – mix concrete casting for mat foundation

Cube test

Re – bar work for mat foundation

Suspended one flight form work

Grade beam and shear wall form work

Swimming pool form work

Swimming pool re-bar mesh and water proofing
Soil excavation
Soil excavation

Sanitary installation on slab

Lift re-bar work

Water proof coating

Lift pit concrete casting

Surveying

Slump test
Hard rock excavation
Monday—Friday
8am — 6pm
Bole behind Getu Commercial
Designed with WordPress